3,135MWh Curtailed
2,993MWh Ramped Up
€1.03MEst. Cost
198 MWPeak Positive

Day-Ahead Spot: 0-198 €/MWh (avg 119)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 4 6,980
TenneT DE positive 1 5,105
50Hertz negative 9 2,950
Amprion positive 2 259
50Hertz positive 2 83
TransnetBW negative 1 52
Amprion negative 1 15
TransnetBW positive 1 12

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges negative 340 5,105 22:July-22:July
ReserveKW Staudinger 5 TenneT DE Konventionell positive 340 5,105 22:July-22:July
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 150 938 08:July-14:July
50H_EDIS_CR_HND 50Hertz Erneuerbar negative 136 919 08:July-15:July
50H_EDIS_CR_WU_NORD 50Hertz Erneuerbar negative 130 712 10:July-15:July
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 100 625 08:July-14:July
50H_EDIS_CR_SOW_Sued 50Hertz Erneuerbar negative 72 451 10:July-16:July
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 84 400 11:July-16:July
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 50 312 08:July-14:July
50H_EDIS_CR_LV_WU 50Hertz Erneuerbar negative 73 272 09:July-13:July
Netzreservekraftwerk Bexbach A Amprion Konventionell positive 250 250 01:July-02:July
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 50 88 11:July-13:July
Börse 50Hertz Sonstiges positive 25 76 00:July-06:July
Schkopau 50Hertz Konventionell negative 60 75 00:July-01:July
Börse TransnetBW Sonstiges negative 11 52 00:July-07:July
Jänschwalde (Standort) 50Hertz Konventionell negative 107 27 04:July-04:July
Börse Amprion Konventionell negative 60 15 07:July-07:July
Börse TransnetBW Sonstiges positive 24 12 02:July-02:July
BIBLIS_GT (bnBm) Amprion Konventionell positive 7 9 12:July-14:July
Börse 50Hertz Sonstiges positive 10 7 23:July-05:July
Schkopau 50Hertz Konventionell negative 26 6 04:July-04:July

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.31M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-07-23?

On 2026-07-23, estimated redispatch costs were approximately €1.03 million. This includes €0.31M for renewable curtailment compensation and €0.45M for conventional ramp-up costs.

Which power plants were most affected on 2026-07-23?

The most affected plant was Börse (TenneT DE) with 5,105 MWh of negative redispatch.

What was the electricity spot price on 2026-07-23?

The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 198 €/MWh with an average of 119 €/MWh.