3,135MWh Curtailed
2,993MWh Ramped Up
€1.03MEst. Cost
198 MWPeak Positive
Day-Ahead Spot: 0-198 €/MWh (avg 119)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 4 | 6,980 |
| TenneT DE | positive | 1 | 5,105 |
| 50Hertz | negative | 9 | 2,950 |
| Amprion | positive | 2 | 259 |
| 50Hertz | positive | 2 | 83 |
| TransnetBW | negative | 1 | 52 |
| Amprion | negative | 1 | 15 |
| TransnetBW | positive | 1 | 12 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | negative | 340 | 5,105 | 22:July-22:July |
| ReserveKW Staudinger 5 | TenneT DE | Konventionell | positive | 340 | 5,105 | 22:July-22:July |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 150 | 938 | 08:July-14:July | |
| 50H_EDIS_CR_HND | 50Hertz | negative | 136 | 919 | 08:July-15:July | |
| 50H_EDIS_CR_WU_NORD | 50Hertz | negative | 130 | 712 | 10:July-15:July | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 100 | 625 | 08:July-14:July | |
| 50H_EDIS_CR_SOW_Sued | 50Hertz | negative | 72 | 451 | 10:July-16:July | |
| 50H_EDIS_CR_PAS | 50Hertz | negative | 84 | 400 | 11:July-16:July | |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 50 | 312 | 08:July-14:July | |
| 50H_EDIS_CR_LV_WU | 50Hertz | negative | 73 | 272 | 09:July-13:July | |
| Netzreservekraftwerk Bexbach A | Amprion | Konventionell | positive | 250 | 250 | 01:July-02:July |
| 50H_WEMA_CR_PMS | 50Hertz | negative | 50 | 88 | 11:July-13:July | |
| Börse | 50Hertz | Sonstiges | positive | 25 | 76 | 00:July-06:July |
| Schkopau | 50Hertz | Konventionell | negative | 60 | 75 | 00:July-01:July |
| Börse | TransnetBW | Sonstiges | negative | 11 | 52 | 00:July-07:July |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 107 | 27 | 04:July-04:July |
| Börse | Amprion | Konventionell | negative | 60 | 15 | 07:July-07:July |
| Börse | TransnetBW | Sonstiges | positive | 24 | 12 | 02:July-02:July |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 7 | 9 | 12:July-14:July |
| Börse | 50Hertz | Sonstiges | positive | 10 | 7 | 23:July-05:July |
| Schkopau | 50Hertz | Konventionell | negative | 26 | 6 | 04:July-04:July |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.31M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-07-23?
On 2026-07-23, estimated redispatch costs were approximately €1.03 million. This includes €0.31M for renewable curtailment compensation and €0.45M for conventional ramp-up costs.
Which power plants were most affected on 2026-07-23?
The most affected plant was Börse (TenneT DE) with 5,105 MWh of negative redispatch.
What was the electricity spot price on 2026-07-23?
The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 198 €/MWh with an average of 119 €/MWh.