2,200MWh Curtailed
1,434MWh Ramped Up
€0.44MEst. Cost
115 MWPeak Positive
Day-Ahead Spot: 34-122 €/MWh (avg 75)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 11 | 18,156 |
| TransnetBW | positive | 2 | 3,070 |
| 50Hertz | negative | 6 | 769 |
| TransnetBW | negative | 3 | 124 |
| Amprion | positive | 1 | 112 |
| 50Hertz | positive | 1 | 20 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| AVA Cluster Voslapp | TenneT DE | negative | 408 | 9,275 | 00:February-23:February | |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | positive | 216 | 2,965 | 00:February-14:February |
| AVA Cluster Helmstedt | TenneT DE | negative | 189 | 2,036 | 06:February-17:February | |
| SHN Cluster Heide West T411 T412 | TenneT DE | negative | 109 | 1,275 | 05:February-17:February | |
| UW Dörpen-West | TenneT DE | negative | 229 | 1,090 | 00:February-05:February | |
| UW Büttel | TenneT DE | negative | 208 | 830 | 10:February-14:February | |
| SHN Cluster Handewitt T414 T415 | TenneT DE | negative | 69 | 812 | 05:February-17:February | |
| SHN Cluster Süderdonn T412 T413 | TenneT DE | negative | 67 | 775 | 05:February-17:February | |
| SHN Cluster Süderdonn T411 | TenneT DE | negative | 100 | 675 | 15:February-23:February | |
| UW Dörpen-West | TenneT DE | negative | 200 | 600 | 05:February-08:February | |
| AVA Cluster Voslapp | TenneT DE | negative | 167 | 500 | 23:February-02:February | |
| 50H Berlin Lichterfelde | 50Hertz | Konventionell | negative | 148 | 296 | 08:February-10:February |
| AVA Cluster Twistetal | TenneT DE | negative | 77 | 288 | 13:February-17:February | |
| 50H_EDIS_CR_WU | 50Hertz | negative | 67 | 250 | 10:February-13:February | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 45 | 135 | 07:February-10:February |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 112 | 112 | 04:February-05:February |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 105 | 105 | 01:February-02:February |
| illwerke vkw AG | TransnetBW | Sonstiges | negative | 98 | 74 | 04:February-05:February |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 35 | 60 | 08:February-10:February |
| Reservekraftwerk Rheinhafen-Dampfkraftwerk Karlsruhe Block 7 | TransnetBW | Konventionell | negative | 30 | 30 | 13:February-14:February |
| Börse | TransnetBW | Sonstiges | negative | 20 | 20 | 13:February-14:February |
| 50H EnviaTherm Bitterfeld GuD | 50Hertz | Konventionell | negative | 20 | 20 | 16:February-17:February |
| Börse | 50Hertz | Sonstiges | positive | 20 | 20 | 16:February-17:February |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 32 | 8 | 09:February-09:February |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.13M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-02-23?
On 2026-02-23, estimated redispatch costs were approximately €0.44 million. This includes €0.22M for renewable curtailment compensation and €0.15M for conventional ramp-up costs.
Which power plants were most affected on 2026-02-23?
The most affected plant was AVA Cluster Voslapp (TenneT DE) with 9,275 MWh of negative redispatch.
What was the electricity spot price on 2026-02-23?
The EPEX Day-Ahead spot price for DE_LU ranged from 34 to 122 €/MWh with an average of 75 €/MWh.