1,845MWh Curtailed
1,047MWh Ramped Up
€0.26MEst. Cost
80 MWPeak Positive
Day-Ahead Spot: 2-76 €/MWh (avg 39)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 5 | 8,688 |
| 50Hertz | negative | 5 | 1,020 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| AVA Cluster Voslapp | TenneT DE | negative | 410 | 6,362 | 03:February-19:February | |
| SHN Cluster Süderdonn T412 T413 | TenneT DE | negative | 190 | 950 | 14:February-19:February | |
| AVA Cluster Helmstedt | TenneT DE | negative | 170 | 638 | 17:February-21:February | |
| SHN Cluster Süderdonn T411 | TenneT DE | negative | 98 | 512 | 15:February-20:February | |
| 50H_EDIS_CR_PAS | 50Hertz | negative | 125 | 375 | 20:February-23:February | |
| 50H_EDIS_CR_PAS | 50Hertz | negative | 74 | 312 | 23:February-14:February | |
| SHN Cluster Handewitt T414 T415 | TenneT DE | negative | 100 | 225 | 16:February-19:February | |
| 50H_WEMA_CR_GUE | 50Hertz | negative | 80 | 200 | 20:February-23:February | |
| CROC Cluster Güstrow | 50Hertz | Sonstiges | negative | 50 | 124 | 20:February-23:February |
| Börse | 50Hertz | Sonstiges | negative | 9 | 9 | 06:February-11:February |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.08M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-02-22?
On 2026-02-22, estimated redispatch costs were approximately €0.26 million. This includes €0.18M for renewable curtailment compensation and €0.07M for conventional ramp-up costs.
Which power plants were most affected on 2026-02-22?
The most affected plant was AVA Cluster Voslapp (TenneT DE) with 6,362 MWh of negative redispatch.
What was the electricity spot price on 2026-02-22?
The EPEX Day-Ahead spot price for DE_LU ranged from 2 to 76 €/MWh with an average of 39 €/MWh.