← 2026-02-21

Sunday, February 22, 2026

2026-02-23 →
1,845MWh Curtailed
1,047MWh Ramped Up
€0.26MEst. Cost
80 MWPeak Positive

Day-Ahead Spot: 2-76 €/MWh (avg 39)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 5 8,688
50Hertz negative 5 1,020

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
AVA Cluster Voslapp TenneT DE Erneuerbar negative 410 6,362 03:February-19:February
SHN Cluster Süderdonn T412 T413 TenneT DE Erneuerbar negative 190 950 14:February-19:February
AVA Cluster Helmstedt TenneT DE Erneuerbar negative 170 638 17:February-21:February
SHN Cluster Süderdonn T411 TenneT DE Erneuerbar negative 98 512 15:February-20:February
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 125 375 20:February-23:February
50H_EDIS_CR_PAS 50Hertz Erneuerbar negative 74 312 23:February-14:February
SHN Cluster Handewitt T414 T415 TenneT DE Erneuerbar negative 100 225 16:February-19:February
50H_WEMA_CR_GUE 50Hertz Erneuerbar negative 80 200 20:February-23:February
CROC Cluster Güstrow 50Hertz Sonstiges negative 50 124 20:February-23:February
Börse 50Hertz Sonstiges negative 9 9 06:February-11:February

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.08M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-02-22?

On 2026-02-22, estimated redispatch costs were approximately €0.26 million. This includes €0.18M for renewable curtailment compensation and €0.07M for conventional ramp-up costs.

Which power plants were most affected on 2026-02-22?

The most affected plant was AVA Cluster Voslapp (TenneT DE) with 6,362 MWh of negative redispatch.

What was the electricity spot price on 2026-02-22?

The EPEX Day-Ahead spot price for DE_LU ranged from 2 to 76 €/MWh with an average of 39 €/MWh.