Silz 1 (Uniper)

ErneuerbarTenneT DE

570Total MWh
4Measures
108 MWAvg Power
0Curtailments
4Ramp-ups

Data: 2025-10-24 to 2025-12-31

Daily Redispatch Volume

DateMeasuresTotal MWh
2025-12-31 1 300
2025-12-08 1 200
2025-12-04 1 20
2025-10-24 1 50

Recent Measures

DateTSODirAvg MWMWhTime
2025-12-31 TenneT DE positive 100 300 05:December-08:December
2025-12-08 TenneT DE positive 200 200 05:December-06:December
2025-12-04 TenneT DE positive 80 20 14:December-14:December
2025-10-24 TenneT DE positive 50 50 19:October-20:October

Frequently Asked Questions

What is the redispatch history of Silz 1 (Uniper)?

Silz 1 (Uniper) is a Erneuerbar power plant in the TenneT DE grid zone. It has received 4 redispatch instructions totaling 570 MWh since 2025-10-24.

Why is Silz 1 (Uniper) frequently redispatched?

Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.