Silz 1 (Uniper)
726Total MWh
6Measures
98 MWAvg Power
0Curtailments
6Ramp-ups
Data: 2025-10-24 to 2026-06-10
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2026-06-10 | 1 | 16 |
| 2026-06-06 | 1 | 140 |
| 2025-12-31 | 1 | 300 |
| 2025-12-08 | 1 | 200 |
| 2025-12-04 | 1 | 20 |
| 2025-10-24 | 1 | 50 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2026-06-10 | TenneT DE | positive | 16 | 16 | 10:June-11:June |
| 2026-06-06 | TenneT DE | positive | 140 | 140 | 01:June-02:June |
| 2025-12-31 | TenneT DE | positive | 100 | 300 | 05:December-08:December |
| 2025-12-08 | TenneT DE | positive | 200 | 200 | 05:December-06:December |
| 2025-12-04 | TenneT DE | positive | 80 | 20 | 14:December-14:December |
| 2025-10-24 | TenneT DE | positive | 50 | 50 | 19:October-20:October |
Frequently Asked Questions
What is the redispatch history of Silz 1 (Uniper)?
Silz 1 (Uniper) is a Erneuerbar power plant in the TenneT DE grid zone. It has received 6 redispatch instructions totaling 726 MWh since 2025-10-24.
Why is Silz 1 (Uniper) frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.