2,195MWh Curtailed
2,171MWh Ramped Up
€0.7MEst. Cost
175 MWPeak Positive
Day-Ahead Spot: -15-177 €/MWh (avg 90)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | positive | 4 | 4,394 |
| TenneT DE | negative | 5 | 4,056 |
| Amprion | positive | 1 | 2,390 |
| 50Hertz | negative | 9 | 1,981 |
| TransnetBW | positive | 3 | 700 |
| TransnetBW | negative | 1 | 209 |
| 50Hertz | positive | 1 | 6 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | positive | 860 | 3,656 | 15:July-20:July |
| LAUSWARD_GUDF | Amprion | Konventionell | positive | 330 | 2,390 | 14:July-21:July |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 200 | 1,600 | 07:July-15:July | |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 200 | 1,600 | 07:July-15:July | |
| 50H_EDIS_CR_WU_NORD | 50Hertz | negative | 221 | 1,438 | 07:July-14:July | |
| Hannover-Linden GuD | TenneT DE | Konventionell | positive | 101 | 581 | 15:July-21:July |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 163 | 490 | 17:July-20:July |
| Wilhelmshaven (ENGIE) | TenneT DE | Konventionell | negative | 176 | 441 | 15:July-17:July |
| BAG NWAK-Cluster 16 Regensburg-Sittling | TenneT DE | negative | 50 | 400 | 07:July-15:July | |
| 50H PV Witznitz | 50Hertz | negative | 150 | 301 | 14:July-16:July | |
| Börse | TransnetBW | Sonstiges | negative | 119 | 209 | 16:July-21:July |
| Braunschweig GT | TenneT DE | Konventionell | positive | 42 | 146 | 16:July-20:July |
| Heizkraftwerk_Pforzheim | TransnetBW | Konventionell | positive | 32 | 127 | 17:July-21:July |
| Börse | TransnetBW | Sonstiges | positive | 42 | 84 | 16:July-20:July |
| 50H_EDIS_CR_LV_WU | 50Hertz | negative | 60 | 75 | 10:July-12:July | |
| 50H PV Bartow | 50Hertz | negative | 79 | 60 | 15:July-16:July | |
| 50H PV Witznitz | 50Hertz | negative | 78 | 58 | 14:July-16:July | |
| 50H UW Bertikow | 50Hertz | negative | 20 | 25 | 14:July-16:July | |
| 50H UW Schönewalde | 50Hertz | negative | 18 | 18 | 14:July-16:July | |
| Irsching 4 | TenneT DE | Konventionell | negative | 15 | 15 | 18:July-19:July |
| Börse | TenneT DE | Sonstiges | positive | 20 | 10 | 22:July-22:July |
| 50H UW Putlitz | 50Hertz | negative | 8 | 6 | 14:July-16:July | |
| Börse | 50Hertz | Sonstiges | positive | 23 | 6 | 08:July-08:July |
| 50H UW Wustermark | 50Hertz | negative | 1 | 0 | 15:July-15:July |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.21M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-07-25?
On 2026-07-25, estimated redispatch costs were approximately €0.7 million. This includes €0.22M for renewable curtailment compensation and €0.26M for conventional ramp-up costs.
Which power plants were most affected on 2026-07-25?
The most affected plant was Börse (TenneT DE) with 3,656 MWh of positive redispatch.
What was the electricity spot price on 2026-07-25?
The EPEX Day-Ahead spot price for DE_LU ranged from -15 to 177 €/MWh with an average of 90 €/MWh.