2,011MWh Curtailed
1,348MWh Ramped Up
€0.38MEst. Cost
102 MWPeak Positive
Day-Ahead Spot: 0-137 €/MWh (avg 67)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 9 | 7,120 |
| Amprion | positive | 3 | 2,307 |
| TenneT DE | positive | 1 | 1,930 |
| 50Hertz | negative | 8 | 641 |
| 50Hertz | positive | 1 | 214 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| UW Dörpen-West | TenneT DE | negative | 531 | 2,124 | 04:February-08:February | |
| Irsching 5 | TenneT DE | Konventionell | positive | 276 | 1,930 | 01:February-08:February |
| UW Büttel | TenneT DE | negative | 584 | 1,753 | 04:February-07:February | |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 166 | 1,287 | 08:February-18:February |
| UW Büttel | TenneT DE | negative | 200 | 1,252 | 11:February-18:February | |
| Emsland Block D | Amprion | Konventionell | positive | 212 | 530 | 04:February-07:February |
| Emsland Block D | Amprion | Konventionell | positive | 245 | 490 | 08:February-10:February |
| UW Dörpen-West | TenneT DE | negative | 245 | 490 | 08:February-10:February | |
| SHN Cluster Heide West T411 T412 | TenneT DE | negative | 100 | 350 | 05:February-09:February | |
| SHN Cluster Husum Nord | TenneT DE | negative | 100 | 350 | 05:February-09:February | |
| SHN Cluster Klixbüll | TenneT DE | negative | 100 | 350 | 05:February-09:February | |
| BAG NWAK-Cluster 15 Pleinting | TenneT DE | negative | 100 | 300 | 11:February-14:February | |
| Schkopau | 50Hertz | Konventionell | positive | 107 | 214 | 05:February-07:February |
| Boxberg (Standort) | 50Hertz | Konventionell | negative | 83 | 166 | 06:February-08:February |
| BAG NWAK-Cluster 17 Altheim | TenneT DE | negative | 50 | 150 | 11:February-14:February | |
| 50H_EDIS_CR_GUE_Sued | 50Hertz | negative | 100 | 125 | 09:February-10:February | |
| Schwarze Pumpe (Standort) | 50Hertz | Konventionell | negative | 56 | 113 | 06:February-08:February |
| Jänschwalde (Standort) | 50Hertz | Konventionell | negative | 42 | 84 | 06:February-08:February |
| 50H Rostock Marienehe | 50Hertz | Konventionell | negative | 26 | 77 | 00:February-08:February |
| 50H Berlin Lichterfelde | 50Hertz | Konventionell | negative | 50 | 50 | 07:February-08:February |
| 50H InfraLeuna IKW | 50Hertz | Konventionell | negative | 18 | 18 | 07:February-08:February |
| Börse | 50Hertz | Sonstiges | negative | 33 | 8 | 16:February-16:February |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.11M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-02-27?
On 2026-02-27, estimated redispatch costs were approximately €0.38 million. This includes €0.2M for renewable curtailment compensation and €0.13M for conventional ramp-up costs.
Which power plants were most affected on 2026-02-27?
The most affected plant was UW Dörpen-West (TenneT DE) with 2,124 MWh of negative redispatch.
What was the electricity spot price on 2026-02-27?
The EPEX Day-Ahead spot price for DE_LU ranged from 0 to 137 €/MWh with an average of 67 €/MWh.