2,489MWh Curtailed
2,104MWh Ramped Up
€0.55MEst. Cost
117 MWPeak Positive
Day-Ahead Spot: 82-132 €/MWh (avg 105)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | positive | 1 | 18,160 |
| TenneT DE | negative | 3 | 1,725 |
| Amprion | negative | 4 | 391 |
| Amprion | positive | 2 | 390 |
| TransnetBW | positive | 1 | 385 |
| TransnetBW | negative | 1 | 28 |
| 50Hertz | positive | 1 | 7 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Börse | TenneT DE | Sonstiges | positive | 1068 | 18,160 | 04:February-21:February |
| UW Büttel | TenneT DE | negative | 495 | 866 | 05:February-07:February | |
| SHN Cluster Handewitt T414 T415 | TenneT DE | negative | 188 | 750 | 07:February-11:February | |
| illwerke vkw AG | TransnetBW | Sonstiges | positive | 220 | 385 | 05:February-07:February |
| LEIPHEIM_10 (bnBm) | Amprion | Konventionell | positive | 136 | 238 | 07:February-09:February |
| Emsland Block D | Amprion | Konventionell | negative | 113 | 198 | 07:February-09:February |
| BIBLIS_GT (bnBm) | Amprion | Konventionell | positive | 34 | 152 | 08:February-15:February |
| Irsching 5 | TenneT DE | Konventionell | negative | 108 | 108 | 05:February-06:February |
| NIEHL-31-GUD | Amprion | Konventionell | negative | 34 | 94 | 12:February-15:February |
| Emsland Block D | Amprion | Konventionell | negative | 34 | 59 | 08:February-10:February |
| NIEHL-31-GUD | Amprion | Konventionell | negative | 32 | 40 | 07:February-09:February |
| Börse | TransnetBW | Sonstiges | negative | 110 | 28 | 05:February-05:February |
| 50H Berlin Marzahn | 50Hertz | Konventionell | positive | 7 | 7 | 06:February-07:February |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.17M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-02-12?
On 2026-02-12, estimated redispatch costs were approximately €0.55 million. This includes €0.25M for renewable curtailment compensation and €0.28M for conventional ramp-up costs.
Which power plants were most affected on 2026-02-12?
The most affected plant was Börse (TenneT DE) with 18,160 MWh of positive redispatch.
What was the electricity spot price on 2026-02-12?
The EPEX Day-Ahead spot price for DE_LU ranged from 82 to 132 €/MWh with an average of 105 €/MWh.