ErneuerbarTenneT DE

73Total MWh
2Measures
36 MWAvg Power
2Curtailments
0Ramp-ups

Data: 2026-04-25 to 2026-04-25

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-04-25 2 73

Recent Measures

DateTSODirAvg MWMWhTime
2026-04-25 TenneT DE negative 36 36 17:April-18:April
2026-04-25 TenneT DE negative 36 36 17:April-18:April

Frequently Asked Questions

What is the redispatch history of AVA Cluster Würgassen?

AVA Cluster Würgassen is a Erneuerbar power plant in the TenneT DE grid zone. It has received 2 redispatch instructions totaling 73 MWh since 2026-04-25.

Why is AVA Cluster Würgassen frequently redispatched?

Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.