4,739MWh Curtailed
5,999MWh Ramped Up
€2.33MEst. Cost
303 MWPeak Positive
Day-Ahead Spot: 226-309 €/MWh (avg 256)
TSO Breakdown
| TSO | Direction | Measures | Total MWh |
|---|---|---|---|
| TenneT DE | negative | 6 | 17,007 |
| 50Hertz | negative | 4 | 3,130 |
| Amprion | positive | 5 | 2,407 |
| 50Hertz | positive | 1 | 28 |
Plant-Level Redispatch Measures
| Plant | TSO | Fuel | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|---|
| Wilhelmshaven | TenneT DE | Konventionell | negative | 514 | 11,569 | 23:November-23:November |
| UW Dörpen-West | TenneT DE | negative | 605 | 3,627 | 23:November-05:November | |
| UW Diele | TenneT DE | negative | 203 | 1,623 | 23:November-07:November | |
| 50H Berlin Marzahn | 50Hertz | Konventionell | negative | 111 | 1,221 | 23:November-12:November |
| Emsland Block C | Amprion | Konventionell | positive | 190 | 1,140 | 23:November-05:November |
| Knapsack 1 | Amprion | Konventionell | positive | 222 | 1,111 | 23:November-04:November |
| Rostock Kohlekraftwerk | 50Hertz | Konventionell | negative | 120 | 1,080 | 23:November-12:November |
| 50H Hamburg Tiefstack 2 HKW SK | 50Hertz | Konventionell | negative | 67 | 801 | 23:November-11:November |
| UW Diele | TenneT DE | negative | 190 | 95 | 22:November-23:November | |
| Hannover-Linden GuD | TenneT DE | Konventionell | negative | 17 | 68 | 23:November-03:November |
| Knapsack 1 | Amprion | Konventionell | positive | 130 | 65 | 22:November-23:November |
| Emsland Block C | Amprion | Konventionell | positive | 110 | 55 | 22:November-23:November |
| KMW_KW5 | Amprion | Konventionell | positive | 9 | 36 | 23:November-04:November |
| 50H Erfurt-Ost HKW GuD | 50Hertz | Konventionell | negative | 14 | 28 | 12:November-14:November |
| Börse | 50Hertz | Sonstiges | positive | 14 | 28 | 12:November-14:November |
| UW Dörpen-West | TenneT DE | negative | 50 | 25 | 22:November-23:November |
How BESS Can Reduce These Costs
Battery Energy Storage Systems at congestion points could have avoided an estimated €0.7M of today's redispatch costs by absorbing excess wind energy locally.
Learn BESS Arbitrage (Free) Stromfee AI PlatformFrequently Asked Questions
How much did redispatch cost on 2026-11-01?
On 2026-11-01, estimated redispatch costs were approximately €2.33 million. This includes €0.47M for renewable curtailment compensation and €1.72M for conventional ramp-up costs.
Which power plants were most affected on 2026-11-01?
The most affected plant was Wilhelmshaven (TenneT DE) with 11,569 MWh of negative redispatch.
What was the electricity spot price on 2026-11-01?
The EPEX Day-Ahead spot price for DE_LU ranged from 226 to 309 €/MWh with an average of 256 €/MWh.