AVA Cluster Landesbergen

ErneuerbarTenneT DE

81Total MWh
5Measures
9 MWAvg Power
5Curtailments
0Ramp-ups

Data: 2025-10-28 to 2026-05-15

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-05-15 3 2
2026-03-25 1 12
2025-10-28 1 67

Recent Measures

DateTSODirAvg MWMWhTime
2026-05-15 TenneT DE negative 3 1 17:May-17:May
2026-05-15 TenneT DE negative 3 1 17:May-17:May
2026-05-15 TenneT DE negative 3 1 17:May-17:May
2026-03-25 TenneT DE negative 12 12 15:March-16:March
2025-10-28 TenneT DE negative 22 67 11:October-14:October

Frequently Asked Questions

What is the redispatch history of AVA Cluster Landesbergen?

AVA Cluster Landesbergen is a Erneuerbar power plant in the TenneT DE grid zone. It has received 5 redispatch instructions totaling 81 MWh since 2025-10-28.

Why is AVA Cluster Landesbergen frequently redispatched?

Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.