AVA Cluster Landesbergen
81Total MWh
5Measures
9 MWAvg Power
5Curtailments
0Ramp-ups
Data: 2025-10-28 to 2026-05-15
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2026-05-15 | 3 | 2 |
| 2026-03-25 | 1 | 12 |
| 2025-10-28 | 1 | 67 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2026-05-15 | TenneT DE | negative | 3 | 1 | 17:May-17:May |
| 2026-05-15 | TenneT DE | negative | 3 | 1 | 17:May-17:May |
| 2026-05-15 | TenneT DE | negative | 3 | 1 | 17:May-17:May |
| 2026-03-25 | TenneT DE | negative | 12 | 12 | 15:March-16:March |
| 2025-10-28 | TenneT DE | negative | 22 | 67 | 11:October-14:October |
Frequently Asked Questions
What is the redispatch history of AVA Cluster Landesbergen?
AVA Cluster Landesbergen is a Erneuerbar power plant in the TenneT DE grid zone. It has received 5 redispatch instructions totaling 81 MWh since 2025-10-28.
Why is AVA Cluster Landesbergen frequently redispatched?
Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.