← 2026-05-16

Sunday, May 17, 2026

2026-05-18 →
2,497MWh Curtailed
1,956MWh Ramped Up
€0.67MEst. Cost
157 MWPeak Positive

Day-Ahead Spot: -2-175 €/MWh (avg 89)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE negative 8 8,415
TenneT DE positive 2 3,665
50Hertz negative 2 436

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges negative 305 1,832 22:May-04:May
ReserveKW Zolling 5 TenneT DE Konventionell positive 305 1,832 22:May-04:May
Börse TenneT DE Sonstiges negative 305 1,832 22:May-04:May
ReserveKW Zolling 5 TenneT DE Konventionell positive 305 1,832 22:May-04:May
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 950 07:May-12:May
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 950 07:May-12:May
BAG NWAK-Cluster 15 Pleinting TenneT DE Erneuerbar negative 200 950 07:May-12:May
BAG NWAK-Cluster 17 Altheim TenneT DE Erneuerbar negative 200 950 07:May-12:May
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 475 07:May-12:May
BAG NWAK-Cluster 16 Regensburg-Sittling TenneT DE Erneuerbar negative 100 475 07:May-12:May
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 35 218 08:May-14:May
50H_WEMA_CR_PMS 50Hertz Erneuerbar negative 35 218 08:May-14:May

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.2M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-05-17?

On 2026-05-17, estimated redispatch costs were approximately €0.67 million. This includes €0.25M for renewable curtailment compensation and €0.23M for conventional ramp-up costs.

Which power plants were most affected on 2026-05-17?

The most affected plant was Börse (TenneT DE) with 1,832 MWh of negative redispatch.

What was the electricity spot price on 2026-05-17?

The EPEX Day-Ahead spot price for DE_LU ranged from -2 to 175 €/MWh with an average of 89 €/MWh.