Zolling GT 2
Konventionell • TenneT DE
217Total MWh
4Measures
22 MWAvg Power
0Curtailments
4Ramp-ups
Data: 2024-10-08 to 2025-08-08
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2025-08-08 | 1 | 44 |
| 2025-08-07 | 1 | 44 |
| 2025-07-31 | 1 | 66 |
| 2024-10-08 | 1 | 63 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2025-08-08 | TenneT DE | positive | 22 | 44 | 08:August-10:August |
| 2025-08-07 | TenneT DE | positive | 22 | 44 | 08:August-10:August |
| 2025-07-31 | TenneT DE | positive | 22 | 66 | 07:July-10:July |
| 2024-10-08 | TenneT DE | positive | 21 | 63 | 07:October-10:October |
Frequently Asked Questions
What is the redispatch history of Zolling GT 2?
Zolling GT 2 is a Konventionell power plant in the TenneT DE grid zone. It has received 4 redispatch instructions totaling 217 MWh since 2024-10-08.
Why is Zolling GT 2 frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.