Zolling GT 1
Konventionell • TenneT DE
323Total MWh
6Measures
21 MWAvg Power
0Curtailments
6Ramp-ups
Data: 2024-10-08 to 2025-11-27
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2025-11-27 | 1 | 47 |
| 2025-11-18 | 1 | 46 |
| 2025-08-08 | 1 | 44 |
| 2025-08-07 | 1 | 44 |
| 2025-06-15 | 1 | 63 |
| 2024-10-08 | 1 | 79 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2025-11-27 | TenneT DE | positive | 19 | 47 | 05:November-08:November |
| 2025-11-18 | TenneT DE | positive | 23 | 46 | 06:November-08:November |
| 2025-08-08 | TenneT DE | positive | 22 | 44 | 08:August-10:August |
| 2025-08-07 | TenneT DE | positive | 22 | 44 | 08:August-10:August |
| 2025-06-15 | TenneT DE | positive | 21 | 63 | 07:June-10:June |
| 2024-10-08 | TenneT DE | positive | 20 | 79 | 06:October-10:October |
Frequently Asked Questions
What is the redispatch history of Zolling GT 1?
Zolling GT 1 is a Konventionell power plant in the TenneT DE grid zone. It has received 6 redispatch instructions totaling 323 MWh since 2024-10-08.
Why is Zolling GT 1 frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.