Zolling GT 1

KonventionellTenneT DE

323Total MWh
6Measures
21 MWAvg Power
0Curtailments
6Ramp-ups

Data: 2024-10-08 to 2025-11-27

Daily Redispatch Volume

DateMeasuresTotal MWh
2025-11-27 1 47
2025-11-18 1 46
2025-08-08 1 44
2025-08-07 1 44
2025-06-15 1 63
2024-10-08 1 79

Recent Measures

DateTSODirAvg MWMWhTime
2025-11-27 TenneT DE positive 19 47 05:November-08:November
2025-11-18 TenneT DE positive 23 46 06:November-08:November
2025-08-08 TenneT DE positive 22 44 08:August-10:August
2025-08-07 TenneT DE positive 22 44 08:August-10:August
2025-06-15 TenneT DE positive 21 63 07:June-10:June
2024-10-08 TenneT DE positive 20 79 06:October-10:October

Frequently Asked Questions

What is the redispatch history of Zolling GT 1?

Zolling GT 1 is a Konventionell power plant in the TenneT DE grid zone. It has received 6 redispatch instructions totaling 323 MWh since 2024-10-08.

Why is Zolling GT 1 frequently redispatched?

Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.