Wolfsburg Süd GT 32
Konventionell • TenneT DE
76Total MWh
1Measures
20 MWAvg Power
0Curtailments
1Ramp-ups
Data: 2026-11-15 to 2026-11-15
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2026-11-15 | 1 | 76 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2026-11-15 | TenneT DE | positive | 20 | 76 | 07:November-11:November |
Frequently Asked Questions
What is the redispatch history of Wolfsburg Süd GT 32?
Wolfsburg Süd GT 32 is a Konventionell power plant in the TenneT DE grid zone. It has received 1 redispatch instructions totaling 76 MWh since 2026-11-15.
Why is Wolfsburg Süd GT 32 frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.