Waldeck 1
Sonstiges • TenneT DE
302Total MWh
3Measures
47 MWAvg Power
1Curtailments
2Ramp-ups
Data: 2024-04-05 to 2024-09-10
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2024-09-10 | 1 | 100 |
| 2024-07-21 | 1 | 169 |
| 2024-04-05 | 1 | 33 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2024-09-10 | TenneT DE | positive | 50 | 100 | 16:September-18:September |
| 2024-07-21 | TenneT DE | positive | 75 | 169 | 09:July-12:July |
| 2024-04-05 | TenneT DE | negative | 16 | 33 | 06:April-17:April |
Frequently Asked Questions
What is the redispatch history of Waldeck 1?
Waldeck 1 is a Sonstiges power plant in the TenneT DE grid zone. It has received 3 redispatch instructions totaling 302 MWh since 2024-04-05.
Why is Waldeck 1 frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.