Walchensee 4
34Total MWh
2Measures
15 MWAvg Power
0Curtailments
2Ramp-ups
Data: 2025-04-01 to 2025-10-24
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2025-10-24 | 1 | 17 |
| 2025-04-01 | 1 | 16 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2025-10-24 | TenneT DE | positive | 17 | 17 | 19:October-20:October |
| 2025-04-01 | TenneT DE | positive | 13 | 16 | 18:April-20:April |
Frequently Asked Questions
What is the redispatch history of Walchensee 4?
Walchensee 4 is a Erneuerbar power plant in the TenneT DE grid zone. It has received 2 redispatch instructions totaling 34 MWh since 2025-04-01.
Why is Walchensee 4 frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.