Walchensee 1

ErneuerbarTenneT DE

27Total MWh
1Measures
18 MWAvg Power
0Curtailments
1Ramp-ups

Data: 2025-04-01 to 2025-04-01

Daily Redispatch Volume

DateMeasuresTotal MWh
2025-04-01 1 27

Recent Measures

DateTSODirAvg MWMWhTime
2025-04-01 TenneT DE positive 18 27 18:April-20:April

Frequently Asked Questions

What is the redispatch history of Walchensee 1?

Walchensee 1 is a Erneuerbar power plant in the TenneT DE grid zone. It has received 1 redispatch instructions totaling 27 MWh since 2025-04-01.

Why is Walchensee 1 frequently redispatched?

Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.