TTG Cluster EE Bechterdissen T411

ErneuerbarTenneT DE

5Total MWh
3Measures
2 MWAvg Power
3Curtailments
0Ramp-ups

Data: 2025-05-08 to 2025-09-10

Daily Redispatch Volume

DateMeasuresTotal MWh
2025-09-10 1 0
2025-05-12 1 5
2025-05-08 1 0

Recent Measures

DateTSODirAvg MWMWhTime
2025-09-10 TenneT DE negative 0 0 14:September-14:September
2025-05-12 TenneT DE negative 5 5 08:May-09:May
2025-05-08 TenneT DE negative 0 0 11:May-11:May

Frequently Asked Questions

What is the redispatch history of TTG Cluster EE Bechterdissen T411?

TTG Cluster EE Bechterdissen T411 is a Erneuerbar power plant in the TenneT DE grid zone. It has received 3 redispatch instructions totaling 5 MWh since 2025-05-08.

Why is TTG Cluster EE Bechterdissen T411 frequently redispatched?

Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.