Silz 2 (TIWAG)
130Total MWh
1Measures
130 MWAvg Power
0Curtailments
1Ramp-ups
Data: 2026-01-22 to 2026-01-22
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2026-01-22 | 1 | 130 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2026-01-22 | TenneT DE | positive | 130 | 130 | 07:January-08:January |
Frequently Asked Questions
What is the redispatch history of Silz 2 (TIWAG)?
Silz 2 (TIWAG) is a Erneuerbar power plant in the TenneT DE grid zone. It has received 1 redispatch instructions totaling 130 MWh since 2026-01-22.
Why is Silz 2 (TIWAG) frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.