Silz 1 (TIWAG)
450Total MWh
2Measures
74 MWAvg Power
0Curtailments
2Ramp-ups
Data: 2024-09-16 to 2024-11-26
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2024-11-26 | 1 | 447 |
| 2024-09-16 | 1 | 3 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2024-11-26 | TenneT DE | positive | 138 | 447 | 13:November-17:November |
| 2024-09-16 | TenneT DE | positive | 11 | 3 | 08:September-08:September |
Frequently Asked Questions
What is the redispatch history of Silz 1 (TIWAG)?
Silz 1 (TIWAG) is a Erneuerbar power plant in the TenneT DE grid zone. It has received 2 redispatch instructions totaling 450 MWh since 2024-09-16.
Why is Silz 1 (TIWAG) frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.