Silz 1 (TIWAG)

ErneuerbarTenneT DE

450Total MWh
2Measures
74 MWAvg Power
0Curtailments
2Ramp-ups

Data: 2024-09-16 to 2024-11-26

Daily Redispatch Volume

DateMeasuresTotal MWh
2024-11-26 1 447
2024-09-16 1 3

Recent Measures

DateTSODirAvg MWMWhTime
2024-11-26 TenneT DE positive 138 447 13:November-17:November
2024-09-16 TenneT DE positive 11 3 08:September-08:September

Frequently Asked Questions

What is the redispatch history of Silz 1 (TIWAG)?

Silz 1 (TIWAG) is a Erneuerbar power plant in the TenneT DE grid zone. It has received 2 redispatch instructions totaling 450 MWh since 2024-09-16.

Why is Silz 1 (TIWAG) frequently redispatched?

Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.