Reservekraftwerk Walheim Block 1

KonventionellTransnetBW

3,116Total MWh
4Measures
75 MWAvg Power
0Curtailments
4Ramp-ups

Data: 2024-02-05 to 2024-02-08

Daily Redispatch Volume

DateMeasuresTotal MWh
2024-02-08 1 736
2024-02-07 1 736
2024-02-06 1 874
2024-02-05 1 770

Recent Measures

DateTSODirAvg MWMWhTime
2024-02-08 TransnetBW positive 78 736 09:February-18:February
2024-02-07 TransnetBW positive 78 736 09:February-18:February
2024-02-06 TransnetBW positive 79 874 09:February-20:February
2024-02-05 TransnetBW positive 64 770 10:February-22:February

Frequently Asked Questions

What is the redispatch history of Reservekraftwerk Walheim Block 1?

Reservekraftwerk Walheim Block 1 is a Konventionell power plant in the TransnetBW grid zone. It has received 4 redispatch instructions totaling 3,116 MWh since 2024-02-05.

Why is Reservekraftwerk Walheim Block 1 frequently redispatched?

Plants in the TransnetBW zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.