OWP Gode Wind 3 AC160
117Total MWh
1Measures
117 MWAvg Power
1Curtailments
0Ramp-ups
Data: 2024-08-21 to 2024-08-21
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2024-08-21 | 1 | 117 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2024-08-21 | TenneT DE | negative | 117 | 117 | 08:August-09:August |
Frequently Asked Questions
What is the redispatch history of OWP Gode Wind 3 AC160?
OWP Gode Wind 3 AC160 is a Erneuerbar power plant in the TenneT DE grid zone. It has received 1 redispatch instructions totaling 117 MWh since 2024-08-21.
Why is OWP Gode Wind 3 AC160 frequently redispatched?
Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.