OWP Borkum Riffgrund 3 Test

ErneuerbarTenneT DE

19Total MWh
1Measures
38 MWAvg Power
1Curtailments
0Ramp-ups

Data: 2025-12-18 to 2025-12-18

Daily Redispatch Volume

DateMeasuresTotal MWh
2025-12-18 1 19

Recent Measures

DateTSODirAvg MWMWhTime
2025-12-18 TenneT DE negative 38 19 08:December-08:December

Frequently Asked Questions

What is the redispatch history of OWP Borkum Riffgrund 3 Test?

OWP Borkum Riffgrund 3 Test is a Erneuerbar power plant in the TenneT DE grid zone. It has received 1 redispatch instructions totaling 19 MWh since 2025-12-18.

Why is OWP Borkum Riffgrund 3 Test frequently redispatched?

Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.