OWP Borkum Riffgrund 3 Test
19Total MWh
1Measures
38 MWAvg Power
1Curtailments
0Ramp-ups
Data: 2025-12-18 to 2025-12-18
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2025-12-18 | 1 | 19 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2025-12-18 | TenneT DE | negative | 38 | 19 | 08:December-08:December |
Frequently Asked Questions
What is the redispatch history of OWP Borkum Riffgrund 3 Test?
OWP Borkum Riffgrund 3 Test is a Erneuerbar power plant in the TenneT DE grid zone. It has received 1 redispatch instructions totaling 19 MWh since 2025-12-18.
Why is OWP Borkum Riffgrund 3 Test frequently redispatched?
Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.