München Süd GT 61

KonventionellTenneT DE

278Total MWh
2Measures
52 MWAvg Power
1Curtailments
1Ramp-ups

Data: 2024-02-20 to 2024-08-22

Daily Redispatch Volume

DateMeasuresTotal MWh
2024-08-22 1 190
2024-02-20 1 88

Recent Measures

DateTSODirAvg MWMWhTime
2024-08-22 TenneT DE positive 69 190 16:August-19:August
2024-02-20 TenneT DE negative 35 88 11:February-13:February

Frequently Asked Questions

What is the redispatch history of München Süd GT 61?

München Süd GT 61 is a Konventionell power plant in the TenneT DE grid zone. It has received 2 redispatch instructions totaling 278 MWh since 2024-02-20.

Why is München Süd GT 61 frequently redispatched?

Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.