Leitzach 2 M22
Sonstiges • TenneT DE
110Total MWh
4Measures
17 MWAvg Power
1Curtailments
3Ramp-ups
Data: 2024-02-26 to 2024-05-27
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2024-05-27 | 1 | 4 |
| 2024-04-24 | 1 | 14 |
| 2024-04-23 | 1 | 55 |
| 2024-02-26 | 1 | 37 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2024-05-27 | TenneT DE | positive | 9 | 4 | 06:May-06:May |
| 2024-04-24 | TenneT DE | negative | 18 | 14 | 07:April-08:April |
| 2024-04-23 | TenneT DE | positive | 20 | 55 | 12:April-15:April |
| 2024-02-26 | TenneT DE | positive | 21 | 37 | 10:February-12:February |
Frequently Asked Questions
What is the redispatch history of Leitzach 2 M22?
Leitzach 2 M22 is a Sonstiges power plant in the TenneT DE grid zone. It has received 4 redispatch instructions totaling 110 MWh since 2024-02-26.
Why is Leitzach 2 M22 frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.