Heizkraftwerk Stuttgart-Münster GT 16,17,18
Konventionell • TransnetBW
270Total MWh
3Measures
31 MWAvg Power
0Curtailments
3Ramp-ups
Data: 2024-11-06 to 2025-11-03
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2025-11-03 | 1 | 25 |
| 2025-01-21 | 1 | 185 |
| 2024-11-06 | 1 | 60 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2025-11-03 | TransnetBW | positive | 17 | 25 | 17:November-19:November |
| 2025-01-21 | TransnetBW | positive | 37 | 185 | 14:January-19:January |
| 2024-11-06 | TransnetBW | positive | 40 | 60 | 09:November-11:November |
Frequently Asked Questions
What is the redispatch history of Heizkraftwerk Stuttgart-Münster GT 16,17,18?
Heizkraftwerk Stuttgart-Münster GT 16,17,18 is a Konventionell power plant in the TransnetBW grid zone. It has received 3 redispatch instructions totaling 270 MWh since 2024-11-06.
Why is Heizkraftwerk Stuttgart-Münster GT 16,17,18 frequently redispatched?
Plants in the TransnetBW zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.