HKW-OF-EVO

KonventionellAmprion

10Total MWh
2Measures
3 MWAvg Power
1Curtailments
1Ramp-ups

Data: 2024-01-22 to 2026-04-11

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-04-11 1 8
2024-01-22 1 2

Recent Measures

DateTSODirAvg MWMWhTime
2026-04-11 Amprion positive 4 8 17:April-19:April
2024-01-22 Amprion negative 2 2 13:January-14:January

Frequently Asked Questions

What is the redispatch history of HKW-OF-EVO?

HKW-OF-EVO is a Konventionell power plant in the Amprion grid zone. It has received 2 redispatch instructions totaling 10 MWh since 2024-01-22.

Why is HKW-OF-EVO frequently redispatched?

Plants in the Amprion zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.