Freimann GT12
Konventionell • TenneT DE
327Total MWh
3Measures
46 MWAvg Power
1Curtailments
2Ramp-ups
Data: 2024-06-11 to 2024-12-02
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2024-12-02 | 1 | 144 |
| 2024-06-17 | 1 | 138 |
| 2024-06-11 | 1 | 45 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2024-12-02 | TenneT DE | negative | 48 | 144 | 05:December-08:December |
| 2024-06-17 | TenneT DE | positive | 46 | 138 | 04:June-07:June |
| 2024-06-11 | TenneT DE | positive | 45 | 45 | 17:June-18:June |
Frequently Asked Questions
What is the redispatch history of Freimann GT12?
Freimann GT12 is a Konventionell power plant in the TenneT DE grid zone. It has received 3 redispatch instructions totaling 327 MWh since 2024-06-11.
Why is Freimann GT12 frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.