Freimann GT11
Konventionell • TenneT DE
42Total MWh
1Measures
42 MWAvg Power
0Curtailments
1Ramp-ups
Data: 2024-11-13 to 2024-11-13
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2024-11-13 | 1 | 42 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2024-11-13 | TenneT DE | positive | 42 | 42 | 21:November-22:November |
Frequently Asked Questions
What is the redispatch history of Freimann GT11?
Freimann GT11 is a Konventionell power plant in the TenneT DE grid zone. It has received 1 redispatch instructions totaling 42 MWh since 2024-11-13.
Why is Freimann GT11 frequently redispatched?
Plants in the TenneT DE zone are frequently ramped up to compensate for curtailed renewables in Northern Germany. This is part of Germany's structural North-South grid bottleneck.