EnBW Pumpverbot
551Total MWh
1Measures
245 MWAvg Power
1Curtailments
0Ramp-ups
Data: 2024-12-16 to 2024-12-16
Daily Redispatch Volume
| Date | Measures | Total MWh |
|---|---|---|
| 2024-12-16 | 1 | 551 |
Recent Measures
| Date | TSO | Dir | Avg MW | MWh | Time |
|---|---|---|---|---|---|
| 2024-12-16 | TransnetBW | negative | 245 | 551 | 00:December-03:December |
Frequently Asked Questions
What is the redispatch history of EnBW Pumpverbot?
EnBW Pumpverbot is a power plant in the TransnetBW grid zone. It has received 1 redispatch instructions totaling 551 MWh since 2024-12-16.
Why is EnBW Pumpverbot frequently redispatched?
Plants in the TransnetBW zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.