EnBW Pumpverbot

TransnetBW

551Total MWh
1Measures
245 MWAvg Power
1Curtailments
0Ramp-ups

Data: 2024-12-16 to 2024-12-16

Daily Redispatch Volume

DateMeasuresTotal MWh
2024-12-16 1 551

Recent Measures

DateTSODirAvg MWMWhTime
2024-12-16 TransnetBW negative 245 551 00:December-03:December

Frequently Asked Questions

What is the redispatch history of EnBW Pumpverbot?

EnBW Pumpverbot is a power plant in the TransnetBW grid zone. It has received 1 redispatch instructions totaling 551 MWh since 2024-12-16.

Why is EnBW Pumpverbot frequently redispatched?

Plants in the TransnetBW zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.