Burghausen

KonventionellTenneT DE

584Total MWh
5Measures
19 MWAvg Power
3Curtailments
2Ramp-ups

Data: 2024-04-30 to 2025-10-26

Daily Redispatch Volume

DateMeasuresTotal MWh
2025-10-26 2 510
2024-09-22 1 20
2024-07-20 1 12
2024-04-30 1 42

Recent Measures

DateTSODirAvg MWMWhTime
2025-10-26 TenneT DE positive 28 300 23:October-09:October
2025-10-26 TenneT DE positive 28 210 15:October-23:October
2024-09-22 TenneT DE negative 13 20 07:September-09:September
2024-07-20 TenneT DE negative 6 12 12:July-14:July
2024-04-30 TenneT DE negative 21 42 07:April-09:April

Frequently Asked Questions

What is the redispatch history of Burghausen?

Burghausen is a Konventionell power plant in the TenneT DE grid zone. It has received 5 redispatch instructions totaling 584 MWh since 2024-04-30.

Why is Burghausen frequently redispatched?

Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.