AVA Cluster Sottrum T412

ErneuerbarTenneT DE

744Total MWh
7Measures
39 MWAvg Power
7Curtailments
0Ramp-ups

Data: 2025-04-15 to 2026-03-25

Daily Redispatch Volume

DateMeasuresTotal MWh
2026-03-25 1 32
2025-10-28 1 154
2025-10-19 1 139
2025-10-05 2 258
2025-09-25 1 43
2025-04-15 1 119

Recent Measures

DateTSODirAvg MWMWhTime
2026-03-25 TenneT DE negative 32 32 15:March-16:March
2025-10-28 TenneT DE negative 38 154 19:October-23:October
2025-10-19 TenneT DE negative 25 139 02:October-08:October
2025-10-05 TenneT DE negative 44 87 22:October-00:October
2025-10-05 TenneT DE negative 49 171 18:October-22:October
2025-09-25 TenneT DE negative 43 43 12:September-13:September
2025-04-15 TenneT DE negative 40 119 12:April-15:April

Frequently Asked Questions

What is the redispatch history of AVA Cluster Sottrum T412?

AVA Cluster Sottrum T412 is a Erneuerbar power plant in the TenneT DE grid zone. It has received 7 redispatch instructions totaling 744 MWh since 2025-04-15.

Why is AVA Cluster Sottrum T412 frequently redispatched?

Plants in the TenneT DE zone are frequently curtailed due to grid congestion from excess renewable generation in Northern Germany. This is part of Germany's structural North-South grid bottleneck.