3,109MWh Curtailed
3,343MWh Ramped Up
€1.12MEst. Cost
215 MWPeak Positive

Day-Ahead Spot: 23-215 €/MWh (avg 139)

TSO Breakdown

TSODirectionMeasuresTotal MWh
TenneT DE positive 2 319
50Hertz positive 2 52

Plant-Level Redispatch Measures

PlantTSOFuelDirAvg MWMWhTime
Börse TenneT DE Sonstiges positive 106 160 14:August-16:August
Börse TenneT DE Sonstiges positive 106 160 14:August-16:August
Börse 50Hertz Sonstiges positive 34 26 22:August-07:August
Börse 50Hertz Sonstiges positive 34 26 22:August-07:August

How BESS Can Reduce These Costs

Battery Energy Storage Systems at congestion points could have avoided an estimated €0.34M of today's redispatch costs by absorbing excess wind energy locally.

Learn BESS Arbitrage (Free) Stromfee AI Platform

Frequently Asked Questions

How much did redispatch cost on 2026-08-16?

On 2026-08-16, estimated redispatch costs were approximately €1.12 million. This includes €0.31M for renewable curtailment compensation and €0.56M for conventional ramp-up costs.

Which power plants were most affected on 2026-08-16?

The most affected plant was Börse (TenneT DE) with 160 MWh of positive redispatch.

What was the electricity spot price on 2026-08-16?

The EPEX Day-Ahead spot price for DE_LU ranged from 23 to 215 €/MWh with an average of 139 €/MWh.